ZONE IDENTIFICATION

We needed to take the saucer and identify and then physically explore the zones to be used for theproject. An area with no water could not be picked as a zone. We tried to locate areas with naturalsprings yielding potable water. The next choice was well water. The last choice was any water whichmay need to be processed with reverse osmosis units if it was not potable. We deliberately selectedZONE 1 knowing that we had potable well water which was considered the best choice since theadministration complex had lots of available electrical power. For the remote zones, we would rathernot have to set up free energy modules and complex processing equipment mainly because the slaveswould not be trained to operate the equipment or even know what the equipment was.

ZONE PREPARATION

Each zone needed a working potable water supply. Also, in each zone, a special container needed to beconstructed, mostly buried in the ground, which would be large enough to hold all the slaves in thatzone. The contract staff was given detailed instructions for the construction but, of course, did not needto know what these containers were to be used for.

PHASE II

HERD PREPARATION

THIS PHASE covers the first seventeen years or so of the project. It is concerned with the preparationof the initial herd of slaves. In time, it will overlap with Phase I, however, Phase I is concerned with sitepreparations using the contract staff. The contract staff will not be involved with herd preparation. Thiswill all be handled by Illuminati staff. All contract staff should be off the planet within fifteen yearsfrom the start of the project.

WAITING FOR THE HATCH

There was not much for the Illuminati staff to as they waited the nine months for the initial slave hatch.It was a period to refresh and go over the protocols. It was also a period to test and become familiarwith the satellite system for slave control and make sure the staff communications system wasfunctioning correctly.